Energy and Climate

Energy Assurance

Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence

The Mesa del Sol microgrid project was selected as one of eight finalists among many entries worldwide to receive the 2014 International Smart Grid Action Network (ISGAN) Award of Excellence. ISGAN will recognize all finalist projects on their website and in future ISGAN publications. The ISGAN Award of Excellence competition showcases the innovative and effective […]

DOE International Energy Storage Database Has Logged 420 Energy Storage Projects Worldwide with 123 GW of Installed Capacity

Berkeley, California, USA, (October 21, 2013) — /PRNewswire-USNewswire/ — The following was released by Strategen Consulting: The U.S. Department of Energy (DOE) today announced that its international energy storage database has surpassed 420 documented energy storage projects from around the world. The database, the first of its kind, provides free, up-to-date information on grid-connected energy […]

Hoboken Hopes To Reduce Power Outages With New ‘Smart Grid’ System

Mayor Says New System Will ‘Keep Everyone Safer Through Next Storm’ HOBOKEN, N.J. (CBSNewYork) – Officials are hoping to reduce power outages during future storms in Hoboken by designing a “smart grid” system using military-inspired technology. The Hudson River came pouring into the streets of Hoboken when Superstorm Sandy struck cutting off road access, putting […]

Hoboken, New Jersey, Mayor Zimmer Announces Infrastructure Initiatives to Address Flooding, Water, and Power Systems

Hoboken, NJ – Wednesday, May 15th, 2013 Hoboken Mayor Dawn Zimmer announced a partnership with North Hudson Sewerage Authority (NHSA) to build Hoboken’s second wet-weather flood pump in order to alleviate Hoboken’s 200-year flooding problem. The pump, with a capacity of 50 million gallons per day, would further alleviate flooding in Western Hoboken. The City […]

SPIDERS Completed Its Phase 1 Operational Demonstration in Late January

The Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Joint Capability Technology Demonstration (JCTD) completed its Phase 1 operational demonstration at Joint Base Pearl Harbor-Hickam in late January 2013. Part of the SPIDERS assessment team scrutinized controller operations, system status, and continuity of operations throughout the demonstration. Their report will focus on system […]

Page 1 of 3123
Feedback